Alpha 0.3.9: Gold Mine wagon expeditions#51
Closed
ael-dev3 wants to merge 2 commits into
Closed
Conversation
ael-dev3
force-pushed
the
agent/alpha-0.3.7-gold-wagon-integration
branch
from
July 18, 2026 18:26
f24fe30 to
47344f4
Compare
This was referenced Jul 18, 2026
Owner
Author
|
Superseded by the audited Alpha 0.3.11 integration in #64, now merged to protected main. Accepted work was reconciled, corrected where needed, and validated there; this original branch is intentionally not merged again. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Alpha 0.3.9 release train
This draft now targets current
mainand carries the unique Gold Mine wagon work only. The already-merged resource and Gold-art preparation commits are no longer duplicated in this PR.What changed
Authority boundary
This remains a draft, undeployed source candidate. No SpacetimeDB publication, resource or Gold-site setup, founder backfill, production seed, Pages deployment, DNS change, tag, release, or merge was performed.
Local verification
0.3.9head.Stack
PR #52 remains the follow-on shared forest-layout draft and will be restacked on this updated head.