Extra labels: writing, security
Tier: M (2-4 days) | Type: writing
Context. Paired with contracts issue #14. Once the threat model is drafted in the contracts repo, mirror it in docs as a public reference.
Scope.
- New
reference/threat-model.mdx.
- Per-contract STRIDE mapping.
- Residual risks called out separately.
- Cross-link with the audits page.
Acceptance.
Files. reference/threat-model.mdx (new).
Extra labels:
writing,securityTier: M (2-4 days) | Type: writing
Context. Paired with contracts issue #14. Once the threat model is drafted in the contracts repo, mirror it in docs as a public reference.
Scope.
reference/threat-model.mdx.Acceptance.
THREAT_MODEL.mdFiles.
reference/threat-model.mdx(new).